Paper Publications
- [57] Liang Ming , jianghongguang , ceshi and yaozhanyong. Experimental and simulation study of phase microstructure and storage stability of asphalt modified with ethylene-vinyl acetate. JOURNAL OF MATERIALS IN CIVIL ENGENEERING, 2019.
- [58] ceshi , yaozhanyong , jianghongguang and 张吉哲. Experimental evaluation of crumb rubber and polyethylene integrated modified asphalt mixture upon related properties. Road Materials and Pavement Design, 2018.
- [59] ceshi , yaozhanyong , jianghongguang , Liang Ming and 张吉哲. Environmental aspects and pavement properties of red mud waste as the replacement of mineral filler in asphalt mixture. Construction and building materials, 180, 605, 2018.
- [60] jianghongguang and yaozhanyong. 基于帽盖模型的强夯地基应力应变特征与有效加固范围分析. 《岩石力学与工程学报(中国科学院)》, 2018.
- [61] jianghongguang , ceshi , Liang Ming and yaozhanyong. Experimental assessment of reclaimed bitumen and RAP asphalt mixtures incorporating a developed rejuvenator. CONSTRUCTION AND BUILDING MATERIALS, 2019.
- [62] jianghongguang , ceshi , Liang Ming and yaozhanyong. Experimental assessment on engineering properties of aged bitumen incorporating a developed rejuvenator. CONSTRUCTION AND BUILDING MATERIALS, 179, 1, 2018.
- [63] jianghongguang , yaozhanyong , ceshi and Liang Ming. Geometry mapping and additional stresses of ballastless track structure caused by subgrade differential settlement under self-weight loads in high-speed railways. TRANSPORTATION GEOTECHNICS, 18, 103, 2019.
- [64] jianghongguang. 高速铁路轨道-路基列车移动荷载模拟的全比尺加速加载试验. 《土木工程学报》, 2015.
Copyright All Rights Reserved Shandong University Address: No. 27 Shanda South Road, Jinan City, Shandong Province, China: 250100
Information desk: (86) - 0531-88395114
On Duty Telephone: (86) - 0531-88364731 Construction and Maintenance: Information Work Office of Shandong University