Hits:
Affiliation of Author(s):岩土与结构工程研究中心
Journal:Marine Georesources & Geotechnology
All the Authors:xuzhenhao,zhangbo
First Author:lishucai
Indexed by:Unit Twenty Basic Research
Document Code:C654017E7C344BE18AF8EDF3D7536E2A
Volume:36
Issue:4
Page Number:379
Translation or Not:no
Date of Publication:2018-06-01
Pre One:The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction: The Case of the Songhua River Water Conveyance Project in the Middle of Jilin Province
Next One:A possible prediction method to determine the top concealed karst cave based on displacement monitoring during tunnel construction