Geologic forward prospecting using improved tunnel-seismic-while-drilling method: A case study of the water supply project at Songhua River, Jilin, China
Hits:
Affiliation of Author(s):岩土与结构工程研究中心
Journal:GEOPHYSICS
First Author:李术才
Document Code:D66B07BAE30C4BF78C0B439EFDF831C1
Volume:87
Issue:2
Number of Words:8000
Translation or Not:no
Date of Publication:2022-03-01