Escape route analysis after water inrush from the working face during submarine tunnel excavation
点击次数:
所属单位:岩土与结构工程研究中心
发表刊物:Marine Georesources & Geotechnology
全部作者:许振浩,张波
第一作者:李术才
论文类型:基础研究
论文编号:C654017E7C344BE18AF8EDF3D7536E2A
卷号:36
期号:4
页面范围:379
是否译文:否
发表时间:2018-06-01
上一条:The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction: The Case of the Songhua River Water Conveyance Project in the Middle of Jilin Province
下一条:A possible prediction method to determine the top concealed karst cave based on displacement monitoring during tunnel construction