中文

Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study

Hits::

  • Institution:齐鲁交通学院

  • Title of Paper:Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault zones with discontinuity layout optimization: A case study

  • Journal:Frontiers of structural and Civil Engineering

  • First Author:闫晓

  • All the Authors:Liu Rentai,张庆松,孙子正,李术才

  • Document Code:FAB7490F384E44F7ABC13C28241457D3

  • Volume:13

  • Issue:6

  • Page Number:1393

  • Number of Words:6

  • Translation or Not:No

  • Date of Publication:2019-10

  • Release Time:2019-10-30

  • Email:

  • PostalAddress:

  • ZipCode:

Copyright All Rights Reserved Shandong University Address: No. 27 Shanda South Road, Jinan City, Shandong Province, China: 250100
Information desk: (86) - 0531-88395114
On Duty Telephone: (86) - 0531-88364731 Construction and Maintenance: Information Work Office of Shandong University
Click:
  MOBILE Version

The Last Update Time:..