A possible prediction method to determine the top concealed karst cave based on displacement monitoring during tunnel construction

Release time:2019-10-25|Hits:

Affiliation of Author(s):齐鲁交通学院

Journal:Bulletin of Engineering Geology and the Environment

All the Authors:lishucai,xuzhenhao,zhangbo

First Author:lishucai

Indexed by:Unit Twenty Basic Research

Document Code:B6A8FCF4A9F34EEE880A7FDF1EA66CC5

Translation or Not:no

Date of Publication:2019-02-01