Yong Li
Professor
Visit:
Paper Publications
开挖顺序对高边墙地下洞室围岩稳定性影响研究
  • Affiliation of Author(s):
    齐鲁交通学院
  • Journal:
    价值工程
  • Key Words:
    地下洞室;;FLAC3D;;数值分析;;开挖优化;;稳定性分析
  • All the Authors:
    Yong Li,zhuweishen
  • First Author:
    王知深
  • Document Code:
    82334
  • Issue:
    01
  • Translation or Not:
    no
  • Date of Publication:
    2018-12-03

Pre One:Splitting failure in side walls of a large-scale underground cavern group: a numerical modelling and a field study

Next One:Impact of In Situ Stress Distribution Characteristics on Jointed Surrounding Rock Mass Stability of an Underground Cavern near a Hillslope Surface

Copyright All Rights Reserved Shandong University Address: No. 27 Shanda South Road, Jinan City, Shandong Province, China: 250100
Information desk: (86) - 0531-88395114
On Duty Telephone: (86) - 0531-88364731 Construction and Maintenance: Information Work Office of Shandong University