邱道宏
|
个人信息Personal Information
教授
性别:男
在职信息:在职
所在单位:土建与水利学院
入职时间:2008-07-16
扫描关注
研究领域
暂无内容
- 傅康. Short-impending decision-making for TBM tunneling control based on loading phase data. Tunnelling and underground space technology, 164, 2025.
- 傅康. TBM tunneling performance fusion prediction based on multimodal decomposition and multi-deep learning. Automation in Construction, 176, 2025.
- 傅康. Optimization of TBM Tunneling Parameters for Deep Buried Tunnel Based on Rock Cluster Grading and Strata Intelligent Identification. Rock Mechanics and Rock Engineering, 2025.
- 傅康. Research on TBM tunnel stratum variation perception with tunneling based on multiple machine learning algorithms. Environmental Earth Sciences, 84, 2025.
- 马啸寅. Comprehensive Geophysical Evaluation of Grouting in the Goaf of an Urban Underground Coal Mine. Mine Water and the Environment, 2024.
- 王鹏. A TBM tunnel collapse risk prediction model based on AHP and normal cloud model. Geomechanics and Engineering, 2024.
- 暂无内容
- 暂无内容
