邱道宏
|
个人信息Personal Information
教授
性别:男
所在单位:土建与水利学院
入职时间:2008-07
扫描关注
研究领域
暂无内容
- 傅康. Short-impending decision-making for TBM tunneling control based on loading phase data. Tunnelling and underground space technology, 164, 2025.
- 傅康. TBM tunneling performance fusion prediction based on multimodal decomposition and multi-deep learning. Automation in Construction, 176, 2025.
- 傅康. Optimization of TBM Tunneling Parameters for Deep Buried Tunnel Based on Rock Cluster Grading and Strata Intelligent Identification. Rock Mechanics and Rock Engineering, 2025.
- 傅康. Research on TBM tunnel stratum variation perception with tunneling based on multiple machine learning algorithms. Environmental Earth Sciences, 84, 2025.
- 马啸寅. Comprehensive Geophysical Evaluation of Grouting in the Goaf of an Urban Underground Coal Mine. Mine Water and the Environment, 2024.
- 王鹏. A TBM tunnel collapse risk prediction model based on AHP and normal cloud model. Geomechanics and Engineering, 2024.
- 暂无内容
- (包干项目)公路隧道全寿命周期注浆堵水-加固机理与数字孪生控制分析方法, 2025-05-01-2028-04-30
- 崩滑流灾害多源异构数据的Web集成及挖掘技术研究, 2022-01-01-2027-06-30
- 道路深层病害注浆治理数字孪生预控决策方法与处治技术, 2024-07-10-2026-07-10
- (包干项目)海底隧道TBM施工机-岩参数物理-数据双驱动预测模型与智能掘进研究, 2024-01-01-2026-12-31
- 小清河复航工程PPP项目通航出海开发成套技术研究及工程应用, 2024-01-24-2027-12-31
- 技术服务合同, 2023-08-30-2027-12-31
- 暂无内容
