邱道宏
个人信息Personal Information
教授
性别:男
在职信息:在职
所在单位:土建与水利学院
入职时间:2008-07-16
扫描关注
- 暂无内容
- . Reevaluation of the design and excavation of underground oil storage cavern groups using numerical and monitoring approaches. Geomechanics and Engineering, 27, 291, 2024.
- 苏茂鑫. Small fixed‐loop transient electromagnetic in tunnel forward geological prediction. GEOPHYSICAL PROSPECTING, 2024.
- 程凯. Instantaneous inversion of transient electromagnetic data using machine learning. ACTA GEOPHYSICA, 2024.
- 苏茂鑫. Parameter Preferences for Length Detection of Reinforcement Cage in Bored Pile. Journal of Performance of Constructed Facilities, 2024.
- 王鹏. A TBM tunnel collapse risk prediction model based on AHP and normal cloud model. Geomechanics and Engineering, 30, 413-422, 2024.
- 马啸寅. Comprehensive Geophysical Evaluation of Grouting in the Goaf of an Urban Underground Coal Mine. Mine Water and the Environment, 42, 513-526, 2024.
- 暂无内容
- 暂无内容