Professor
Supervisor of Doctorate Candidates
Supervisor of Master's Candidates
The Last Update Time: ..
刘东. Detection and comprehensive treatment for giant karst caves under the tunnel floor: a case study in Guangxi, China. Environmental Earth Sciences, 2024.
赵岐. A Fast and Efficient Method for 3-D Transient Electromagnetic Modeling Considering IP Effect. IEEE TRANSACTIONS ON GEOSCIENCE AND REMOTE SENSING , 2024.
刘锐. Investigation of subsurface karst in an opencast mine in southwestern China via surface and cross-borehole electrical resistivity tomography. Exploration Geophysics, 2023.
孙怀凤. The first semi-airborne transient electromagnetic survey for tunnel investigation in very complex terrain areas. Tunnelling and underground space technology, 132, 2023.
Tang, Xiang. Improved adaptive regularization for simulated annealing inversion of transient electromagnetic. Scientific Reports, 14, 2024.